1642 · Home battery · v1 · Nov 23 2026

A whole-house battery that never talks to Duke.

The inverter in the closet (EG4 12000XP) is an off-grid inverter/charger: grid power can come in, nothing ever goes out. Add two EG4 All-Weather batteries and a second breaker box, and the house rides through outages on its own — no interconnection, no net metering, no Duke paperwork.

1 · How the power moves

Tap a scenario. The arrows are where electricity actually flows.

Dukemeter New 200Amain panel from the addition Tankless waterheater (24 kW) grid only — too big for the inverter EG4 12000XP inverter · OWNED 12 kW · no export 2× EG4 All-Weather 28.6 kWh · outside wall Solar panelsphase 2 · ~10 kW Loads panel (new 2nd breaker box) AC · mini-split · kitchen · range fridge · lights · outlets · internet in only → ✕ nothing goes back

2 · Where it goes in the house

North is up. The addition (right) is drawn from sheet A1 (rev 10-12-2026); the existing house is from the 2025 MLS CubiCasa scan, so treat its rooms as approximate. Tap an option.

batteriesinverter loads panelmain panel 3-ft no-battery zone 36" working space

Close-up: storage room + NE corner (what the electrician will look at)

3 · What it can run, and for how long

Tick what's on during an outage. Numbers are estimates until we meter the house (an ~$150 Emporia Vue on the panel gives real ones in a week).

BATTERY ONLY
–
IF EVERYTHING TICKED RAN AT ONCE
WITH ~10 kW OF PANELS (PHASE 2)
The one outage rule: don't run the dryer and the oven at the same time. If too much runs at once the inverter shuts itself off and you press reset. Annoying, not dangerous.

4 · Exactly what to buy

Prices checked Nov 23, 2026.

5 · What to tell the electrician

Scope: non-export battery backup using an owner-supplied EG4 12000XP off-grid inverter/charger + 2× EG4 WallMount All-Weather batteries. No grid interconnection, no utility application, no export.

  1. Feed the inverter from the new 200A main panel: breaker sized per EG4's 12000XP diagram (grid input rated 100A @ 240V) to the AC IN / GRID terminals. 120/240V split phase with neutral.
  2. Install a loads subpanel fed from the 12000XP AC OUTPUT, sized for the 100A pass-through. Move every circuit to it except the tankless water heater (dryer: decide at walk-through).
  3. Neutral-ground bond only at the main service. Disable the inverter's internal N-PE bond and prove with a meter there's no second bond.
  4. Mount the inverter inside the storage room (north wall, east of the bifold) and the batteries outside on the east block wall at the NE corner, by the new main panel. 36" working space, smoke/heat detector in the room, R328 / NFPA 855 spacing outdoors.
  5. Battery DC wiring per EG4's manual (cable size, breakers, Class-T fuse or DC disconnect if required). Install the closed-loop CAN comms cable and confirm the inverter reads battery state of charge.
  6. A bypass / maintenance switch so the house can run straight from grid if the inverter is ever pulled.
  7. Optional, recommended: 240V generator inlet to the 12000XP GEN input (62.5A max).
  8. Install the owner-supplied soft start on the central AC condenser.
  9. Labels and disconnects per NEC 706/480. Pull the City of St. Petersburg electrical permit, get the final.
  10. Leave a conduit path and wall space for the future solar disconnect and rapid-shutdown wiring to the inverter's two PV inputs.

Not in scope: hybrid/grid-tie inverter, export settings, Duke interconnection or net-metering application, separate automatic transfer switch (the 12000XP is the transfer switch), EG4 GridBoss, whole-home generator.

Fair price (Pinellas, est.): $3,500–6,500 labor + $1,500–3,000 parts. Cheapest done during the addition while the new panel is open.

Red flags — someone is upselling or building the wrong thing

They say…What's really going on
"Go hybrid — Sol-Ark / Tesla / Enphase / EG4 18kPV"Replaces the inverter you own; most of those are grid-tie, which is what brings Duke in.
"We'll file with Duke just in case"Creates the relationship you're avoiding. A non-export system has nothing to file.
"You need an automatic transfer switch"The 12000XP switches itself in under 10 ms.
"We'll supply the batteries"Usually a 30–50% markup on hardware you can buy direct.
"The tankless can go on the battery"24 kW is twice what the inverter can make.
They never ask about neutral-ground bondingThey haven't installed an off-grid inverter before.
Over ~$10K for the battery/inverter install alonePadding, or they're pricing batteries you're buying yourself.

6 · Your three moves, in order

  1. Ask Trident one question about the shower window (east wall, inside the shower). It's the only thing between the batteries and the perfect spot. Either delete it, or get plan review to say a fixed window doesn't trigger the 3-ft battery rule.
  2. Call St. Pete plan review (727-893-7231): "Will you accept a UL 1973 / UL 9540A battery with a UL 1741 off-grid inverter outdoors, or do you require a UL 9540 system listing? And can this ride on the addition's electrical permit?"
  3. Then buy the two batteries and the soft start through Stale Chips, after filing for the Florida solar sales-tax exemption.